ServicesRoof Replacement
Roof Replacement in Jamestown
Once repairs stop paying off, we strip your roof down to bare wood and put a new one on properly. The small crew that climbs up for the first look is the same crew that pulls the old shingles, fixes the sheathing and sets the final ridge cap.

Repair or Replace: How We Decide
Age alone doesn't mean you need a new roof. Replacement makes sense when the shingles no longer keep water out and every repair just moves the leak somewhere else. If a repair will hold up for years, we'll say so and send you to our roof repair page.
Shingles wear out from the whole roof's exposure, not one bad spot. Years of snow melting and refreezing at the edges, plus long summer days drying out the asphalt, wear the entire surface down together. At that point a new roof is the fix that lasts.
Our crew is small by design. There's no salesman who hands you off to strangers. The people who measure your roof are the people who build it, so the details you talked about on day one are still in mind on the last day.

What a Full Replacement Includes
- 01
Every old layer removed
We pull off all the old shingles rather than stacking new ones on top. With the wood bare, we can actually see it and repair it.
- 02
Sheathing checked by hand
We walk the open deck and swap out any sheets that are soft, rotted or coming apart. Before we replace anything, we show you photos of it.
- 03
Leak barrier where water collects
A self-adhering membrane runs up from the roof edge and down each valley, the spots where melting snow backs up and runoff is heaviest. The rest of the deck gets synthetic underlayment.
- 04
Fresh flashing and drip edge
We put new metal around chimneys, sidewalls and vent pipes instead of reusing the old pieces. New drip edge sends water into the gutter and away from the fascia.
- 05
Balanced attic airflow
Air comes in at the soffits and leaves at the ridge vent. A steady flow keeps the attic drier, helps the shingles last and means fewer ice dams in winter.
- 06
Cleanup and magnet sweep
All the old roofing goes in our dumpster and leaves with us. We roll a magnet over the yard, beds and driveway, then walk around the house with you.
Questions about Roof Replacement?
Call(937) 806-4359Signs It's Time for a New Roof
Shingles curling or cupping
Corners that turn up or middles that dip tell you the shingles have dried out. Wind can lift them, and rain gets in behind.
Shingle grit piling up
A newly installed roof sheds some loose granules. When an older roof leaves heaps of it in the gutters or downspouts, the shingles are wearing through.
Leaks showing up in several rooms
A single leak often traces back to flashing. Water coming in at several spots usually means the roof as a whole is giving out.
Spongy feel or sagging
If the roof gives when you step on it, or dips between rafters, the sheathing is wet or rotting. That only gets worse.
Patch after patch
Three or four repairs in a few years is a sign your money would go further on a new roof. A roof inspection will show you where things stand.
How Your Replacement Goes
- 1
First look, top and bottom
We climb onto the roof and, when there's access, go into the attic too. We look at shingles, flashing, sheathing and airflow, then give you a straight repair-or-replace answer.
- 2
Estimate on paper
The estimate spells out tear-off, materials, flashing, ventilation and how bad wood will be priced if we find it. Where your town requires a permit, we pull it.
- 3
Strip and cover
We cover siding, windows and shrubs, then pull the old roof. We only open as much as we can get underlayment on before quitting time, so your house is covered every night.
- 4
Building the new roof
Underlayment, flashing, shingles and ridge vent go on in order. The usual job is finished in one to three days up top, and a bigger house or a wet week pushes it toward the longer end.
- 5
Walk-around together
After cleanup and the nail sweep, we walk the job with you. Anything that doesn't look right to you gets fixed before we pack up.
What Sets the Price of a New Roof
You get a number only after we've been up on your roof. The estimate comes in writing and broken into parts, so you can read every line. These are the items that shift the total the most.
- Roof area and pitch
- Each added square means more shingles on the order and more hours on site. On a steep pitch the crew works from roof jacks in harnesses, which takes longer.
- How many old roofs come off
- Some houses have two or three roofs stacked on each other. Every extra layer lengthens the tear-off and adds weight to haul to the dump.
- Wood beneath the old roof
- Soft or rotted sheathing is cut out and replaced. Nobody knows how many sheets until the shingles are off, so your estimate shows the price per sheet up front.
- Which shingle you pick
- Standard architectural shingles are the lowest price. Thicker designer lines run higher. We bring samples and explain what you get for the difference.
- Openings and angles
- Chimneys, skylights and valleys each need their own flashing and slow hand work. A plain gable roof goes faster than one with lots of angles.
Questions About Replacing Your Roof
How many days does a roof replacement take?
For most houses it's one to three days on the roof. A large or steep roof, or a lot of bad sheathing, can add time. We'll set a schedule with you before we start and call you if rain pushes a day.
Does someone have to be home during the work?
You don't need to stay home. Please keep your phone handy so we can reach you if we find rotted wood or anything else worth a look. During tear-off, it helps to park on the street and keep pets indoors.
Is it okay to shingle over my old roof?
That's not something we do. Covering an old roof hides the wood underneath, adds weight to the framing and tends to cut years off the new shingles. Stripping it all lets us repair the deck while it's open.
Do you put roofs on in the winter?
On milder days, yes. Shingles need some warmth for their sealant strip to bond, so on cold jobs we keep an eye on the forecast and may seal the edges by hand. Spring to fall is the easier stretch, and those dates book up.
Will I see the same faces every day?
You will. One small crew handles your roof from the first shingle pulled to the last nail swept up. You'll know who's working at your home and who to talk to with a question.
Is now a good time to redo my gutters too?
Often it is, because the drip edge and the gutters hand water off to each other. If yours sag or have pulled away from the house, ask about our gutters and soffit and fascia work while we're already set up.

Find Out Where Your Roof Really Stands
Let us know what you've noticed up there and we'll pick a day to climb up and check it. After that you'll have a line-by-line estimate and a plain answer on whether to fix it or replace it.